Gateway II Project
Gateway II Stormwater Retrofit Project
Background
The City’s Stormwater Utility received a grant from the Washington State Department of Ecology (Ecology) to design and construct drainage improvements along both sides of Vantage Highway from Vista Road to the City limits. The project will collect and treat stormwater runoff from Vantage Highway in the project area, which will reduce the amount of stormwater pollution that flows into Lyle Creek. This will improve water quality and habitat within Lyle Creek as well as the downstream Wilson Creek and Yakima River. Along with constructing attractively landscaped stormwater treatment swales along the road, the project will also build pedestrian and bicycle pathways to enhance community accessibility.
The Ecology grant covers design, permitting, and construction for the entire 1-mile project. The City has hired a consultant, Aspect Consulting (Aspect), to design the project and oversee construction.
Project Area
Existing Conditions
Proposed Concept
Conceptual Design
Click on the following link to see an initial concept and layout for the project.
Gateway II Conceptual Design Drawings
Please note the figures provided are conceptual in nature and are for informational purposes only. Future plans will be provided on this project webpage as design milestones are met.
Project Impacts and Feedback
We know that it will be necessary to modify some driveway entrances within the project area and that residents and businesses will experience some disruptions during construction. We also know that local residents and business owners may be aware of conditions and information that would be helpful to Aspect and the City as the project design progresses.
Please click on the link below to provide your feedback about the project and any information you have for our consideration.
Project Schedule
- Topographic Survey: late February 2022
- Soils Investigation & Infiltration Testing: late March 2022
- Preliminary Design: Summer 2022
- Final Design: Fall 2023
- Construction: Winter 2023 – 2024
Please continue to visit this page for periodic project updates.
For more information, contact:
Jon Morrow
Stormwater Manager
morrowj@ci.ellensburg.wa.us
(509) 925-8619